So today we kept on working on our hydroelectric generator, we started where we left off yesterday. Today we split into groups again. Lisette and I worked on the tri fold board today, while the rest of the group worked on building the model. I wasn't there for part of the building, so I don't really know exactly what happened, but this is what I did for the tri fold board. Lisette made titles and subtitles that were going to be needed for our board. So we made those titles and subtitles blue because hydropower is water, and water is blue. so then we printed those words and out and used a cutting board and cut all of the words out seperately. We then got dark blue construction paper and glued the all of the words on it to make a cool background for them. We then went back to the cutting board and cut those out. Some trouble we had with just doing thhis was that it was hard to make sure that the lines we cut were going to be perfectly straight or not, so a few times we cut a crooked line, but we just fixed it by evening it out. But suprisingly we never had to re print one because it was so bad. All of our mistakes were pretty minor.
Today the other group (Gabriel, Sara, Elizabeth, and Carlos) worked on building the model. For the part that I saw they got out the big orange bucket and started to cut holes into it so that we could place the spoon wheel into it. But we kind of made a big mistake on it. We were supposed to drill a small hole into the bucket so that the spoon wheel could be placed in. But we accidently cut a really big hole. But that wouldn't work because they were to big for the spoon wheel, so there would be extra space, and the extra space would let the water leak. Which would ruin the whole point of the project. So then T.J. from the Hydropower group from the other team helped us and we hot glued the little circles that we cut out back on to the bucket, which enclosed it. So tomorrow we are going to drill the hole the right way!